Tokyo Electron
Provisional entry — research in progress
This page was generated automatically from cited public sources and hasn't completed the full research pass yet. Every specification shown carries its source; more detail is added as research completes.
Tokyo Electron NT 333 is TEL's first semi-batch chamber for ALD. Tokyo Electron NT 333 has a wafer size of 300 mm. Tokyo Electron NT 333 uses a 2-chamber reactor.[1]
The Tokyo Electron NT 333 is an atomic layer deposition (ALD) system. The NT 333 is Tokyo Electron's first semi-batch chamber for ALD. The tool is designed for 300 mm wafer processing.[1]
The NT 333 employs a spatial ALD method rather than conventional time-divided ALD. In spatial ALD, the chamber is partitioned into complementary sections that allow simultaneous exposure to and adsorption of precursors and reactants in a continuous mode. One ALD cycle is completed by one rotation of the wafer stage. Multiple substrates can be processed simultaneously within each chamber.[1]
The system includes a unique plasma shield that mitigates plasma damage while maintaining high stage rotation speeds. The NT 333 supports both thermal and plasma-enhanced ALD processes. High stage rotation speeds and an optimized gas delivery system enable high productivity by well-isolated reaction zones.[1]
The NT 333 is capable of operating at low temperatures and provides tunable film stresses. The tool includes pre- or post-treatment steps within each ALD cycle to enhance film quality.[1]
The NT 333 deposits silicon dioxide (SiO2), silicon nitride (SiN), and high-k dielectric films. The system processes silicon (Si) and silicon-on-insulator (SOI) substrates. The tool is suited for applications requiring high step coverage, high film quality, high throughput, stress controllability, and low plasma damage.[1]
Generated from public-source data on file. Enter your email to access — nothing is published; details are routed privately.
No research found yet — worked with this tool? Share what you know.
The following facts about the NT 333 are absent from this record as of this revision. First-hand knowledge or a citation closes a gap; every submission is reviewed before publication.
No publicly documented production dates or lifecycle milestones (introduction, end of production, EOL) for the NT 333 are on record.
Answerable by: OEM historical records or a trade-press announcement
No publicly documented variants, configuration options, or revision breakpoints of the NT 333 are on record.
Answerable by: an OEM product catalog or an engineer who ordered or specified the tool
The control-system platform and OS era of the NT 333 are not on record.
Answerable by: an engineer who operated it or OEM installation records
No publicly documented failure modes or field errata for the NT 333 are on record.
Answerable by: a field service engineer, process engineer, or maintenance technician
The process node or technology generation of the NT 333 is not on record.
Answerable by: an OEM datasheet or a fab qualification report
No research found yet — worked with this tool? Share what you know.
Last updated Oct 7, 2026.
The Applied Materials 0010-13622 is an RF match unit intended for PVD (Physical Vapor Deposition) described as a High Efficiency HE RF Match-Bias.
The Applied Materials 0020 12458 Part is an insulator, side match component for the Hdp-Cvd Ultima Plus system.